•     Jan. 2019 – Present New York City Transit Authority (NYCTA) Component Replacement of High Tension Switchgear at 7 Substations, New York City ($17 million): Review, sign and stamp all shop drawings and as-builts. The scope includes replacement of 7 AC switchgear with 52 breakers at 7 existing substation that are in service. Working closely with the manufacturer is critical since entrance to the existing substations are small. The AC Switchgear for this project are custom made and are designed to be broken down for transport. KEMA testing will be required. Integration with existing control system is also required.
•     Aug. 2018 – Present New York City Transit Authority (NYCTA) Rehabilitation of Circuit Breaker House 586, New York City ($6 million): Reviewed, signed and stamped all shop drawings and as-builts. This project includes 1 DC circuit breaker line-up feeding 3 tracks. Installation of new positive cables and replacement of control and battery cables were also included. Review of Factory Acceptance Test (FAT) Procedures and attending the FAT before delivery and installation was also in scope.
•     Aug. 2017 – Present New York City Transit Authority (NYCTA) Canarsie Tube Rehabilitation, New York City ($477 million): As the approved PE Traction Power Engineer, Daniel created, reviewed, signed and stamped all shop drawings and as-builts. The scope on this project was to coordinate/design the Ave B substation and 2 circuit breaker houses. This also includes systems such as SCADA, Tube Shell Protection, Battery System and Cable Sheath Protection. Coordination across all disciplines were required to ensure there were no conflicts within the substation. Working with the manufacturers and setting up Factory Acceptance Tests were also required. To energize the substation Daniel will be required to go through the Con Edison inspection and testing process to mitigate any concerns that they may have.
•     Feb. 2017 – Dec. 2017 New York City Transit Authority (NYCTA) 53rd St Tube Rehabilitation, New York City ($59 million): Daniel was brought in late into this project to expedite the completion of the existing Roosevelt Island traction power substation rehabilitation portion. Upon arrival, the new power equipment was on site and placed into position but nothing else was done yet. The tasks included removing old equipment, removing old control wiring, install new equipment, install new control wiring and integrating the new equipment into the old equipment. New equipment including (2) AC Switchgear, (2) 3MW rectifier transformers, (2) machine breakers, (4) feeder breakers, (1) bus tie breaker and all associated peripheral power equipment. Integration with the existing rectifier was particularly challenging since there were gaps between what the manufacturer provided for interconnections and what the as-builts showed. In addition, over the course that the substation was out of service, various wiring and devices had gone missing. To energize the substation Daniel was required to go through the Con Edison inspection and testing process to mitigate any concerns that they had.
•     Jan. 2017 – Dec. 2018 New York City Transit Authority (NYCTA) Clark St Tube Rehabilitation, New York City ($63 million): As the approved PE Traction Power Engineer, Daniel reviewed shop drawings for positive cable feeders and jumpers, negative equalizers and transpositions and tube shell protection system connection replacements. In addition, control cables throughout the tube were also replaced from one existing Control Terminal Boxes to another.
•     Oct. 2014 – Dec. 2018  New York City Transit Authority (NYCTA) Signal System Modernization for 34th St. Interlocking, New York City ($94 million) & W 4th St. Interlocking, New York City ($89.5 million): As the approved PE Traction Power Engineer for both projects, Daniel designed shop drawings as well as coordination/ integration drawings to ensure the proper installation of the upgraded negative return system from W 4th St. station to 47st St. station. The installation of the new equalizers required significant amounts of coordination because the existing system had to remain in service with cutting over to occur in phases which is linked to signal installation work. Tight spaces and tube structures introduced challenges that needed well-designed alternatives. Third rail and positive jumpers were also rerouted and upgraded during this project which required extensive coordination with signal equipment. In addition to being the Traction Power Engineer, Daniel also designed and coordinated all of the electrical systems in the new 1000ft x 40ft transit space containing Mechanical Rooms, Fire Suppression Room, Batter-UPS, Train Control Room, Relay Room, Comm Closets, Water Meter Room, Master Tower and other various facilities. All AC power was being fed from an existing EDR over 2000ft away.
•     Jul. 2013 – Jul. 2015 New York City Transit Authority (NYCTA) 207th St. Train Yard DC Power Upgrade Project, New York City ($9 million): As the approved PE Traction Power Engineer for the 207th DC Power Upgrade, Daniel designed shop drawings as well as coordination/ integration drawings to ensure in the proper installation of steel and electrical equipment. Extensive effort was placed on the delicate movement and final placement of the DC switchgear building which was brought through the Maintenance Shop on high rail to be craned on top of the roof. Daniel was deeply involved with the switchgear equipment and controls during installation and testing. All on-site testing and troubleshooting was performed by Daniel. Comprehensive measures were taken for orchestrating the installation of the DC Trolley System. To finalize the project Daniel performed a DC stray current test. In addition to the DC portion of the project, there were AC electrical system upgrades to a Boiler House. This included running new feeder cable from the nearby transformer house and feeding all new panels. Equipment was installed in parallel with the existing system to allow a simple cutting over from old loads to new.
•     Dec. 2011 – Jul 2013 Metropolitan Transit Authority Capital Construction (MTACC), New York City Transit Authority (NYCTA) Fulton Street Transit Center Project, New York City ($1.4 Billion): Part of PB Construction Services serving as an MTACC office engineer within the specialized integration team focusing on communication issue while simultaneously coordinating integration and commissioning efforts across 5 different contracts within one project site.  Disciplines dealt with include communications, mechanical, electrical, plumbing, and architecture; more specifically steam, electrical distribution rooms, fiber optic networking, local networking, public addressing systems, speakers, customer information sign, fire alarm systems, fire suppression systems, telephones, elevators, escalators, water chillers and heaters, lighting, advertising electronics, ventilation, radio communication, help points, and CCTV for NYCTA and NYPD. Specific tasks included coordinating meetings, recording minutes for official record, tracking submittals, giving input on RFI responses, creating scopes of work or RFP’s as a result of office and/or field meetings and creating diagrams/schematics for overall referencing and presentations.
•     Oct. 2011 - Dec. 2011 Cincinnati Streetcar Project, Cincinnati, Ohio: Using overhead catenary system for a new streetcar system in downtown Cincinnati to revitalize a failing neighborhood by connecting to existing systems via a loop to spanning from Henry St. to Second St. Daniel performed designs drawings and layouts for 3 new traction power substations. The Traction Power Substations were of prefabricated type to be place in property owned by the city.  One particular location was placed beyond the limits of the system to enable future expansion.  This substation presented the challenge of spanning across the highway I-71 and continuing over 1000’ to closet pole mounted disconnect switch for positive feed. 
•     Dec. 2010 - Oct. 2011 Metro-North Railroad (MNRR), 86th St. & Park Ave., New York City ($10 million):  This project was composed of 3 separate jobs in the MNRR system along Park Ave., north of Grand Central Station to increase the power capabilities.  The first site at 86th St. required a single-ended substation to be upgraded to a double-ended substation doubling capacity at that location.  Power would temporarily be provided by 2 substations, 1 upstream and 1 downstream, to maintain service during construction. Careful consideration and coordination had to be taken in designing due to extreme spatial constraints.  Site 2, which was at 110th St., entailed relocating 4 negative reactors from the mezzanine level within the substation to outside at the viaduct level while increasing the capacity of each; the existing negative reactors reached their maximum capacity.  At site 3, Claremont Parkway, MNRR wants to install a new prefabricated substation to increase the power supplied to the system to aid in the future demand loads. 
•     Sept. 2010 - Jul. 2012 MTA Worldwide Inspection Services, New York City Transit (NYCT), New York City:  PB is managing a multimillion-dollar inspection contract in which PB is providing material source inspection services for rail vehicle components, signaling equipment, rail and special trackwork, structural steel, wood products, paints and chemicals.  PB's contract requires all inspections to be performed within 5 working days after notification by NYCT.  Additionally, a comprehensive inspection report with customized inspection checklists must be submitted. Daniel has performed relay, wire and cable inspections in factories at Invensys Rail Group, Marion, KY, and Draka Cableteq USA at Schuylkill Haven, PA.  Responsibilities include comparing specified requirements in data sheets/drawings and specifications to test results and dissected sample measurements. In addition to the factory inspection, Daniel has also performed wire and cable sample inspections offsite. 
•     Dec. 2009 – Dec. 2010 Long Island Railroad (LIRR) Atlantic Yards/LIRR Vanderbilt Yard Relocation, Brooklyn, New York City: The client, Forest City Ratner Companies (FCRC) is building the new NBA Nets Arena (Barclays Center) which is located at LIRR Vanderbilt yard.  For the arena to be constructed Vanderbilt yard had to be moved east.  Daniel performed designs for a temporary substation, permanent substation, employee facility, MG set, third rail feeds, lighting and conduit layouts throughout each of the stages.  A tremendous effort was placed on staging to maintain service during all construction while allowing minimal outages when necessary.  As a result of the rapid nature of this project, as-built and archived drawings were reviewed and field verified frequently to ensure that next-stage designs were as accurate as possible.  Great amounts of coordination between the contractor (McKissak), LIRR, FCRC and sub consultants were essential for the verification and design process. 
•Nov. 2010 - April 2011 Port Authority of New York & New Jersey (PANYNJ), Security Program Management (SPM): Daniel assisted multiple project managers in the SPM department in various stages of their projects.  Tasks included reviewing request for qualifications (RFQ), request for information (RFI), and request for proposals (RFP).  Further experience includes final inspections at multiple sites throughout the Port Authority Trans-Hudson (PATH) system for security access and monitoring network.  Final inspections consisted of reviewing as-built drawings while test protocols listed on the original design drawings were performed.
•     Oct. 2009 – May 2010 Maryland Transit Authority (MTA) Light Rail System, Pumphrey Substation Rehabilitation, Baltimore, Maryland: Daniel served as resident engineer inspecting repairs on equipment, scheduling, and managing efforts between MTA forces, the prime contractor, and three subcontractors to clean, replace, and repair fire damages to three 700VDC circuit breakers at Pumphrey Substation from a 34kV utility source.  Rehabilitation efforts were to restore the substation to its original specifications and manufacturer’s as-built drawings.  While on site, Daniel executed adjustments to scope of work and cost estimate. 
•     Jun. 2008 - Dec. 2009 California High Speed Train Project (CHSTP): The California high speed train is proposed to provide service from Sacramento and San Francisco to San Diego.  Daniel performed a simulation study from Burbank Station to Irvine Station which was the most power demanding segment.  Serving as task manager, collecting data and coordinating work efforts was part of his role while carrying out the simulation concurrently.  Simulation work included numerous sessions to establish a normal peak operation.  From here, 7 contingencies were simulated to find the limits of the proposed electrical system.  A final product was a report summarizing the results and recommendations to modify the electrical system. 
•     Jan. 2008 – Jun 2008 Caltrain, Electrification Program, California:  Caltrain plans to run electric trains on over 50 miles of track from San Francisco to San Jose.  Serving as task manager, Daniel’s involvement in this project dealt with simulating the entire system using the Train Operation Model (TOM) computer program.  The TOM program simulated the physical characteristics (train types, grades, curve, etc.) of Caltrain’s 2x25kV autotransformer electrification system as well as the electrical characteristics (substation locations, cable distances, energy consumption, etc.).  The train operations that were considered included high speed trains, EMU’s with and without regeneration, locomotives and numerous contingency cases were taken into account.  Daniel coordinated with Caltrain personnel directly while organizing an engineering team to process all the data collected for a simulation report as well as for a presentation. 
•     Jan. 2008 – Jun 2010 Metro-North Railroad (MNRR), New Haven Rail Yard, Connecticut:  participated in the design and layout of upgrades to the rail yard.  The initial design consisted of multiple contracts that include numerous buildings.  As time progressed, funding dictated reduction in the scale of work that Metro-North Railroad had intended.  Focus shifted from a Service & Inspection Shop, West End Yard Design, and Diesel Storage Yard to the Component Change Out (CCO) Shop and Electric Multiple Unit (EMU) Shop.  Adapting to many changes in this project was the key to success.  Major work performed on this project to date was completed on the CCO Shop.  Daniel executed layouts inside and outside the shop to interface from the bug (traction power) and stinger (auxiliary/hotel power) equipment to the DC room and from the DC room to the DC substation.  He also aided comprehensively in the development of equipment details and cut sheets while regularly dealing with cost estimates, drawing organization, and specifications. 
Jun. 2007 – Jan 2008 Hampton Roads Transit, Norfolk, Virginia:  performed the initial traction power layout for Second Street, York Street, Military Highway, Sewells Junction, Holt Street, and Newton Road Traction Power Substation (TPSS) sites.  He also performed some layouts at the Vehicle Service Maintenance Facility (VSMF) Shop in the yard.  Researched utility pathways to ensure that the conduit and manhole layout did not interfere with local utilities.  Created the cable and conduit schedule for each of the TPSS sites.  